ORBES · ISS Data

ISS Crew Activity
Workload Analysis

Computed from International Space Station daily crew timeline PDFs 2001-2014 published by issinrealtime.org. Click any chart element to drill into the underlying tasks.


🔧 Maintenance / Inspection

2001–2014 · PDF crew timelines

Avg maintenance hours / day

2.99

across 4,327 days analysed

Total maintenance hours

12,934

summed across all years

Estimated crew time cost

$1.68B

at $130,000/hr · NASA commercial crew rate

🔧 Maintenance Hours per Year

12,933total hours · 13 years

Most Common Maintenance Tasks

500unique tasks identified

#TaskOccurrencesTotal hrs
1
morning inspection
5,515850.8h
2
🇷🇺сож maintenance(life support system)
2,8951781.8h
3
elektron vm aerosol filter inspection
86672.2h
4
🇷🇺morning inspection sm псс caution warning panel test
33755.7h
5
tvis maintenance(Treadmill with Vibration Isolation and Stabilization)
29153.1h
6
sm ventilation system preventive maintenance
273475.5h
7
wrs water sample analysis
21536.2h
8
payload status check
19926.8h
9
maintenance of
165104.9h
10
plants 2 payload status check
14311.9h
11
morning inspection laptop rs1 2 reboot
11919.8h
12
oca ssc router reboot
1069.3h
13
start bsa battery charge
10542.3h
14
daily payload status check
10220.9h
15
ssc file server reboot
847.0h
16
t2 snubber arm inspection
8312.8h
17
🇷🇺коб2 4гб4 half coupling shell coolant leak check
7514.7h
18
inspection of 1 separator
7510.4h
19
tvis monthly maintenance(Treadmill with Vibration Isolation and Stabilization)
7240.4h
20
battery stowage assembly bsa battery recharge terminate
7213.2h
21
o2 level check
7111.1h
22
weekly maintenance of tvis(Treadmill with Vibration Isolation and Stabilization)
706.3h
23
matryoshka r monitoring lulin 5 readings
7023.7h
24
ekam worf battery swap
677.4h
25
icv makita battery replacement
645.3h
26
morning inspection rss1 2 reboot
589.7h
27
ehs air quality monitor aqm end
576.1h
28
🇷🇺ип 1 flow sensor position check
5513.7h
29
ehs air quality monitoring aqm start
559.3h
30
mo 8 cleanup
549.0h
31
🇷🇺inspection of брпк separator
544.5h
32
🇷🇺fgb цв2 fan cleaning
54128.8h
33
iridium phone charging status check
534.4h
34
cgba status check
524.3h
35
icv makita battery swap
514.3h
36
ared guide rail inspection
519.8h
37
dcs battery charging
484.4h
38
icv 3h makita battery changeout
464.3h
39
hms defibrillator inspection
466.0h
40
wrs maintenance
4523.5h
41
increment 4 payload status check
4412.6h
42
hatch seal inspection
4448.2h
43
🇷🇺inspection of срв к2м sediment trap insert
4312.8h
44
izgib dakon payload status check
423.5h
45
🇷🇺cleaning гжт4 gas liquid heat exchanger вт 7 fan screen
4159.4h
46
water recovery system filling a cwc i from pwd aux port
4014.1h
47
terminate bsa battery charge
406.9h
48
morning inspection laptop rs2 1 reboot
406.5h
49
start emu battery charge
3914.5h
50
weekly housecleaning
3893.0h
51
🇷🇺treadmill т2 monthly inspection
386.4h
52
ssc oca router reboot
383.2h
53
rebooting oca ssc router
383.2h
54
cgba status check and monitor cleaning
384.6h
55
🇷🇺сож maintenance inspection of брпк separator(life support system)
3718.3h
56
msg visual inspection and activation
376.2h
57
morning inspection laptop rss2 reboot
376.2h
58
red bolt maintenance
3612.0h
59
rebooting all pcs weekly
369.0h
60
motorola phone charging status check
363.0h
61
laptop rs1 2 reboot
365.9h
62
uragan fss pl battery charge start
356.0h
63
carbon dioxide level monitoring
354.3h
64
potable water dispenser pwd daily ambient flush
346.0h
65
defibrillator checkout
3416.8h
66
ssrms checkout
3316.5h
67
water recovery system recycle filter tank assembly rfta r r
3229.2h
68
kazbek fit check
3216.2h
69
odf replacement
3128.0h
70
lab payload daily status check
3112.1h
71
🇷🇺в3 fan screen cleaning in dc1
3030.3h
72
toca calibration
309.3h
73
plazmenniy kristall pressure check
302.5h
74
🇷🇺inspection of брпк 1 separator
302.5h
75
uf1 payload status check
297.4h
76
mo 21 prep ecosphere battery charge
299.7h
77
environmental health system ehs csa cp calibration
2912.4h
78
🇷🇺cleaning вд1 and вд2 air ducts in dc 1
2919.3h
79
makita battery swap recharge
282.4h
80
safer checkout
2716.8h
81
reboot laptop rs2 1
274.6h
82
plazmennyi kristall pressure check
272.3h
83
lab window leak check
273.2h
84
cgba 5 status check
272.3h
85
plasma crystal 3 turbo pump deactivation
262.2h
86
ekam battery swap
264.3h
87
cgba 5 bioprocessor status check
262.2h
88
cevis monthly maintenance
267.8h
89
🇷🇺брпк separator inspection
252.1h
90
tvis r r(Treadmill with Vibration Isolation and Stabilization)
2567.6h
91
spheres battery charge
252.8h
92
🇷🇺orlan and бсс preliminary leak check
252.1h
93
morning inspection rss1 rss2 reboot
254.3h
94
energy water sample collection
252.5h
95
daily status check of us payloads
259.9h
96
csa cp battery changeout
255.1h
97
scheduled inspection of red
243.3h
98
routine inspection of red
245.7h
99
laptop rs2 1 reboot
244.1h
100
us lab payload status check
223.7h
101
termo lada visual inspection of hardware operation
221.8h
102
rgn rec tk transfer and replacement
2217.0h
103
rebooting all pcs pws
229.9h
104
plasma crystal 3 turbo pump activation
221.8h
105
lab payload status check
224.1h
106
icv makita battery installation
223.3h
107
emu battery discharge
225.7h
108
🇷🇺dc1 бсс orlan interface unit checkout
227.3h
109
🇷🇺cleaning вд1 and вд2 air ducts in mrm2
2213.3h
110
🇷🇺ипд air sampling for ammonia in sm
214.9h
111
morning inspection of the station
213.5h
112
medical restraint system cmrs checkout
2110.3h
113
🇷🇺в3 fan screen cleaning in mrm2
2019.8h
114
wrm condensate pumping terminate
204.8h
115
wrm condensate pumping initiation
208.4h
116
station inspection
203.7h
117
mrm1 fan screen cleaning group b
2021.3h
118
maintenance
2013.0h
119
🇷🇺inspection of брпк 2 separator
201.7h
120
icv battery replacement
201.7h
121
csa cp zero calibration
206.9h
122
🇷🇺сож maintenance inspection of брпк(life support system)
199.3h
123
wrm condensate pumping start
197.3h
124
weekly station cleanup
1948.6h
125
toca water sample analysis
194.8h
126
sdto t2 inspection
193.2h
127
rws cable checkout
191.8h
128
red inspection and access evaluation
194.7h
129
pmm cleanup
1930.3h
130
🇷🇺cleaning fgb гжт detachable screens 1 2 3
1919.0h
131
🇷🇺clean fgb цв1 fan guard screen
199.4h
132
cgba status check and maintenance
191.7h
133
ared rope replacement
1917.5h
134
ared lubrication
1921.3h
135
reboot all pcs once a week
184.8h
136
iridium phone charging terminate charge cleanup
183.0h
137
icv makita battery stow
181.7h
138
🇷🇺fe 1 сож maintenance(life support system)
189.8h
139
emu battery charge start
186.2h
140
bioprocessor and cgba 5 status check
181.5h
141
veg daily plant check
171.4h
142
t2 monthly inspection
175.0h
143
respiratory support pack checkout
174.5h
144
pcs reboot once a week
174.3h
145
albedo battery charge start
172.8h
146
🇷🇺сож maintenance брпк separator inspection(life support system)
168.0h
147
vhf comm check using us ground sites
163.9h
148
toca waste water bag wwb changeout
162.8h
149
system laptop terminal slt reboot
162.8h
150
🇷🇺spacesuit and бсс orlan interface unit leak checks and valve tests
1616.0h
151
rasteniya 2 hardware status check
161.3h
152
glove box msg troubleshooting
163.0h
153
cwqmk water sample analysis
1612.8h
154
csa cp battery replacement
164.0h
155
compound specific analyzer combustion products csa cp spot check
162.7h
156
aseptic monitoring automatic pump shut off
161.3h
157
water recovery
151.7h
158
station support computer ssc server fan cleaning
152.8h
159
rfta cleanup ops
153.1h
160
red routine inspection
153.3h
161
🇷🇺progress 361 rodnik water tank 1 бв1 bladder leak check
152.0h
162
plasma crystal pressure check
151.3h
163
pgt checkout
1510.8h
164
morning inspection reload laptop rss2
152.5h
165
monthly maintenance of tvis(Treadmill with Vibration Isolation and Stabilization)
159.5h
166
microgravity science glovebox msg troubleshooting
1511.3h
167
installation of reba batteries
153.7h
168
air duct removal from dc1 skip b3 fan removal
153.8h
169
🇷🇺вкс laptops antivirus scan check and status report
142.5h
170
wrm terminate condensate pumping
144.2h
171
waste water bag wwb replace
142.4h
172
power tool battery reconditioning
141.2h
173
post docking hatch leak check
147.0h
174
plasma crystal 3 plus turbo pump activation
141.2h
175
pba and pfe inspection
148.3h
176
🇷🇺orlan and бсс controls checkout
141.2h
177
msg visual inspection of equipment
142.3h
178
morning inspection laptop rss1 2 reboot
142.4h
179
icv 3h battery replacement
141.2h
180
health maintenance system hms food frequency questionnaire
142.7h
181
🇷🇺fgb цв1 fan grille cleaning
146.9h
182
emu battery charge init
144.3h
183
cir manifold bottle replacement
147.0h
184
cevis isolator checkout
145.7h
185
7 payload status check increment 8
141.2h
186
monitor makita drill battery charge
131.1h
187
maintenance closures of vozdukh abk valves
133.0h
188
lab smoke detector inspection
137.8h
189
kentavr fit check
136.5h
190
inspace2 tape changeout
132.2h
191
increment 7 daily payload status check
132.2h
192
🇷🇺fgb цв1 fan screen cleaning
136.2h
193
emu checkout
1311.3h
194
defibrillator battery 1 charge start
136.2h
195
a l smoke detector inspection
136.8h
196
vo2max portable pfs software calibrations and instrument check
127.0h
197
viable bag inspection
125.4h
198
sprut 2 setup body mass measurement and cleanup
126.0h
199
rusalka battery charge start
122.1h
200
puff initial calibration
124.0h
201
plt maintenance of
127.6h
202
msg visual inspection
122.0h
203
morning inspection laptop rss1 rss2 reboot
122.0h
204
monthly maintenance of cevis
124.3h
205
🇷🇺inspection of см у connector on мнр нс separator pump behind асу
122.0h
206
increment 9 payload status check
121.0h
207
icv 3 hour battery swap
121.0h
208
🇷🇺dc1 су and су progress hatch leak check
1212.0h
209
condensate pumping initiation
124.9h
210
cleaning ventilation screens on fgb interior panels
1219.7h
211
🇷🇺сож maintenance ип 1 position verification(life support system)
117.2h
212
🇷🇺маi 75 equipment deactivation and cleanup
111.7h
213
water sample analysis using total organic carbon analyzer toca
111.8h
214
vacuum cleaner equipped with narrow nozzle attachment with potok unit
111.8h
215
spheres installation of charged batteries
111.8h
216
sozh maintenance
117.3h
217
🇷🇺sfog тгк fan deactivation
110.9h
218
separator ops check up and air bubble removal
110.9h
219
replace pille flash card
111.8h
220
payload status check increment 9
110.9h
221
oxygen level check
111.4h
222
on orbit calibration of red
119.0h
223
msg troubleshooting
116.8h
224
monthly tvis maintenance(Treadmill with Vibration Isolation and Stabilization)
116.1h
225
merlin desiccant replacement
112.2h
226
mdca hardware replacement
1126.2h
227
izgib dakon payload status check tagup with specialists s band
110.9h
228
inspection of 2 separator
110.9h
229
daily us payload status check
114.4h
230
csa cp routine maintenance
114.5h
231
🇷🇺сож maintenance r g 8916 step 1(life support system)
106.3h
232
🇷🇺пхо бк 3м oxygen tank pressure check
101.7h
233
weekly station cleaning
1022.2h
234
spice burner replacement
102.0h
235
spacesuit systems checkout
105.6h
236
self inspection for reaction
100.8h
237
sdto tvis maintenance(Treadmill with Vibration Isolation and Stabilization)
101.7h
238
pwd cleaning
102.5h
239
pulmonary function in flight puff initial calibration
103.3h
240
pma2 leak check
103.7h
241
plasma crystal 3 plus turbo pump deactivation
100.8h
242
🇷🇺orlan fit check at suit pressure р ск 0 4
102.5h
243
off day lab payload status check
101.7h
244
new ethernet checkout
101.7h
245
morning inspection reboot laptop rss1 rss2
101.7h
246
merlin condensation status check
100.8h
247
makita battery stow
101.0h
248
maintenance closures of vozdukh emergency vacuum valves abk
101.8h
249
mai 75 hardware activation and checkout
101.7h
250
iss 7 daily payload status check
101.7h
251
inspace2 cassette changeout
101.7h
252
gathering co2 sensor data
102.5h
253
co2 level monitoring
101.1h
254
🇷🇺checkout of бсс spacesuit interface unit in dc1
103.9h
255
bonner ball maintenance
104.1h
256
16 morning inspection
101.6h
257
🇷🇺пхо бсс checkout
93.3h
258
🇷🇺брпк 2 separator inspection
90.8h
259
🇷🇺брпк 1 separator inspection
90.8h
260
🇷🇺аpxc maintenance work area setup
92.3h
261
water sample analysis
92.4h
262
usnd2 hardware checkout before the experiment
94.5h
263
red scheduled inspection
91.7h
264
red cable replacement
99.8h
265
puff final calibration
93.0h
266
potable water dispenser pwd beverage adapter cleaning
93.9h
267
plt inspection of 1 separator
91.5h
268
plasma crystal 3 turbopump deactivation
90.8h
269
🇷🇺plasma crystal 3 plus пк 3 plus eb turbo pump activation
90.8h
270
otklik hardware check
92.3h
271
orlan fit check at orlan pressure 0 4
92.3h
272
makita battery recharge
91.5h
273
maintenance of red bolts
94.7h
274
maintenance of per go
95.5h
275
laptop 2 battery cycling
92.5h
276
iss inspection
91.5h
277
🇷🇺inspection of см у connector on мнр нс pump behind асу panel
91.4h
278
increment 4 payload status check including 8 payloads
92.3h
279
health maintenance system hms tonometry test setup
91.9h
280
emu battery charge term
93.3h
281
emu backpack replacement
93.7h
282
dcs battery replacement
91.3h
283
🇷🇺dc1 бк 3м oxygen tank pressure check
91.5h
284
comm configuration check
90.8h
285
🇷🇺checkout of бсс spacesuit interface unit in пхо
93.6h
286
checkout of 0501 gas analyzer using 3 gas meter control readings
91.5h
287
🇷🇺16 conjugation replace cold packs in biocont т
91.5h
288
1 separator inspection
91.3h
289
🇷🇺ипд air sampling for ammonia
81.7h
290
wrs filling recycle filter tank assembly from edv
81.7h
291
sshdtv memory card replacement
80.8h
292
ssc iss server reboot
80.7h
293
slt reboot
80.8h
294
sample bag inspection
80.7h
295
rusalka battery charge
81.3h
296
rings battery replacement
80.8h
297
red on orbit calibration
86.0h
298
red calibration
85.9h
299
pre return bps status check
80.7h
300
post eva orlan suit maintenance
81.3h
301
pma3 leak check closeout ops
82.8h
302
orlan systems check
84.7h
303
nutrition cleaning refrigerator centrifuge and equipment stow
81.8h
304
node 1 node 2 and node 3 bacteria filter cleaning
87.1h
305
mds visual inspection
81.3h
306
life support system maintenance
85.0h
307
jem airlock leak check
81.5h
308
itcs flow meter battery charge
80.9h
309
🇷🇺inspection of см у connector on мнр нс separator pump behind
81.3h
310
inspace2 tape replacement
81.3h
311
fe 1 lab window leak check
80.7h
312
express rack 6 potable water dispenser iodinated ambient water flush
80.7h
313
ehs water sample analysis t 2 days
84.2h
314
csa o2 analyzer calibration
83.3h
315
condensate pumping terminate
82.3h
316
cleaning ventilation screens on fgb interior panels panels 201 301 401
88.0h
317
🇷🇺cleaning auxiliary computer system вкс laptops
818.3h
318
🇷🇺changeout of replaceable condensate removal lines смок
816.0h
319
cfe maintenance work area prep
81.9h
320
cevis exercise protocol swap
81.4h
321
bonner ball status check
82.8h
322
🇷🇺battery installation in orlan telemetry unit брта
81.3h
323
altea cnsm check
80.7h
324
2 separator inspection
80.7h
325
18 morning inspection
81.3h
326
🇷🇺пхо бсс spacesuit interface unit checkout
72.5h
327
🇷🇺пхо бсс orlan interface unit checkout
72.6h
328
🇷🇺бк 3 oxygen tank pressure check
71.8h
329
whc liquid indicator r r
77.8h
330
weekly cleaning
715.6h
331
water sample analysis toca
72.8h
332
water recovery system wrs urine pretreat assembly upa fill
72.6h
333
water recovery system wrs
71.5h
334
vo2max pfs sw calibration and hardware checkout
73.9h
335
vacuum pressure gauge accuracy check
73.5h
336
uragan fss pl battery charge terminate
71.2h
337
tvis quarterly maintenance(Treadmill with Vibration Isolation and Stabilization)
75.8h
338
treadmill t2 monthly inspection
72.0h
339
toca waste water bag wwb replace
71.2h
340
terminate emu battery discharge
71.4h
341
spheres deactivation checkout and stowage
72.3h
342
scheduled red inspection
71.7h
343
same sample carousel changeout
72.7h
344
🇷🇺routine maintenance of кн and кв tank valves in sm rodnik system
71.8h
345
pmm endcone cleanup
79.2h
346
plasma crystal turbo pump activation
70.6h
347
periodic inspection of red
71.8h
348
pace sample changeout
76.7h
349
p l status check
71.0h
350
🇷🇺orlan interface unit бсс checkout
71.8h
351
🇷🇺orlan and бсс initial conditions check in run
71.2h
352
oga hydrogen sensor r r
76.0h
353
msg inspection and cleaning
75.4h
354
mrm1 fan screen cleaning group c
79.3h
355
motorola phone charging terminate charging cleanup
71.2h
356
most water quality measurement
74.1h
357
morning inspection rss2 reboot
71.2h
358
morning inspection rss 1 2 reboot
71.2h
359
morning inspection reboot laptop rss2
71.3h
360
morning inspection reboot laptop rs2 1
71.1h
361
middeck payload status check
71.7h
362
melfi n2 pressure check
71.2h
363
measuring defibrillator battery voltage
71.8h
364
mass constituents analyzer mca valve open
70.7h
365
mass constituents analyzer mca valve close
70.7h
366
makita battery charge
70.7h
367
iss morning inspection
71.2h
368
inspection of lab emergency light power supply
73.3h
369
inspace cassette replacement
71.2h
370
increment 4 daily p l status check
72.1h
371
htv hardware command panel hcp checkout
72.7h
372
hms vision check
74.3h
373
gasmap hrf routine health check power up
71.8h
374
fluid servicing system fss installation
76.1h
375
expedition 9 payload status check
70.6h
376
emu lib battery charge end
72.8h
377
emu fan pump separator fps remove and repair
719.8h
378
emu cooling loop maintenance part 3
75.6h
379
emu battery discharge term
70.8h
380
elite s2 calibration
73.3h
381
dvcam battery charge
71.2h
382
cleaning liv tvs voltage converter ventilation grille
73.5h
383
cir maintenance work area prep
72.4h
384
ccaa swapover
74.3h
385
ared cable r r
77.5h
386
altcriss pcmcia card replacement
71.2h
387
2 morning inspection
71.2h
388
🇷🇺15 сож maintenance(life support system)
73.5h
389
🇷🇺срв к2м sediment trap insert inspection
61.6h
390
🇷🇺сож maintenance check ип 1 position(life support system)
63.2h
391
whc pump separator inspection
60.5h
392
weekly station cleanup mo vol 1 item 2 2 1 page 2 2
613.0h
393
water delivery system wds tank bladder leak check using compressor
61.7h
394
tvis troubleshooting(Treadmill with Vibration Isolation and Stabilization)
69.9h
395
terminate emu battery charge
61.3h
396
terminate bsa battery maintenance cycle
61.1h
397
ssc reconfig for emu battery ops
61.5h
398
rss1 2 reboot
61.0h
399
respiration experiment ops and cleanup tagup with specialists s band
67.8h
400
relaksatsiya relaksatsiya p l battery charge
61.0h
401
pma3 leak check
63.9h
402
plt inspect 1 separator
61.0h
403
plasma crystal 3 turbopump activation
60.5h
404
plasma crystal 3 leak check
60.5h
405
pl status check
60.6h
406
🇷🇺orlan and бсс controls check out
60.5h
407
🇷🇺on go прк atv interface leak check
67.5h
408
msg subsa troubleshooting
63.2h
409
🇷🇺morning inspection sm псс test
61.0h
410
monthly cevis maintenance
62.0h
411
merlin desiccant replace
60.9h
412
melfi nitrogen pressure check
61.3h
413
melfi hardware status check
60.5h
414
mefli bioprocessor status check
60.5h
415
marangoni maintenance work area mwa transfer
61.5h
416
maintenance of o n go
63.9h
417
life support maintenance
63.7h
418
lab window inspection
66.0h
419
jem cleaning
68.5h
420
iss file server reboot
60.5h
421
iss 9 pl status check
60.5h
422
iss 8 7 payload status check
60.5h
423
installation of orlan spacesuit replaceable elements for eva
63.2h
424
inspection of working compartment shell and ring
69.0h
425
inspection of a l emergency light power supply
62.7h
426
inspect 1 separator
61.0h
427
increment 9 p l status check
60.5h
428
icv start battery charge
60.5h
429
icv makita battery swap 3 hours
60.5h
430
health maintenance system hms ultrasound stow
62.0h
431
gasmap hrf routine health check power down
60.5h
432
food warmer inspection and ifm
66.9h
433
🇷🇺final inspection of orlan and бсс
62.0h
434
fe 1 tvis maintenance(Treadmill with Vibration Isolation and Stabilization)
60.5h
435
emu cooling loop maintenance part 2
63.0h
436
emu battery recharge term
61.2h
437
emu battery recharge init
62.0h
438
defibrillator battery voltage measurement
61.5h
439
defibrillator battery charge
61.4h
440
dcs battery stowage
60.7h
441
csa cp scheduled maintenance
62.8h
442
comm reconfig after orlan comm check
61.3h
443
comm check and biomed telemetry test
62.0h
444
columbus rgsh inspection cleaning
64.5h
445
co2 monitoring
60.5h
446
🇷🇺cleaning бвн heater fan screen in
62.0h
447
cleaning ventilation screens on fgb interior panels 116 316 231 431
68.0h
448
cleaning iss rs habitation area interior panels
66.0h
449
🇷🇺cleaning fgb гжт gas liquid heat exchanger detachable screens 1 2 and 3
66.0h
450
cir close cir manifold bottle valves
60.6h
451
check payload equipment in lab
61.7h
452
cdra r r
68.8h
453
cdra maintenance
66.7h
454
cda screen inspection in columbus
61.3h
455
🇷🇺beta 08 data output device уси checkout using gamma 1m
63.0h
456
bcat6 sample check
60.5h
457
bcat battery replacement
60.5h
458
bass fan calibration
63.0h
459
aseptic monitoring pump automatic shut off tagup with specialists
60.5h
460
ared rope replacement assistance
64.6h
461
all pcs reboot once a week
61.8h
462
aed inspection
60.5h
463
9 circa makita battery charging
60.5h
464
21 morning inspection
61.0h
465
🇷🇺сож maintenance брпк inspection(life support system)
52.4h
466
🇷🇺сож maintenance verification of ип 1 sensor position(life support system)
52.7h
467
🇷🇺пк 3 plus turbo pump deactivation
50.4h
468
🇷🇺пк 3 plus turbo pump activation
50.4h
469
🇷🇺коб2 leak check panel 4спн2
51.7h
470
🇷🇺ип 1 sensor installation check
51.3h
471
🇷🇺гфи 1 relaksatsiya p l battery charge
50.8h
472
🇷🇺гфи 1 geophysical studies start sony dcr trv900e battery charge
50.4h
473
🇷🇺гфи 1 geophysical studies relaksatsiya experiment battery charging
50.8h
474
🇷🇺бсс checkout in dc1
51.6h
475
wrs leak check
57.3h
476
whc configuration to upa post rfta r r
50.4h
477
weekly maintenance of tvis bearings(Treadmill with Vibration Isolation and Stabilization)
50.4h
478
water recovery system wrs waste storage tank assembly wsta fill
52.1h
479
vtr tape changeout
50.6h
480
viru battery charge start
50.8h
481
vacuum cleaner equipped with narrow nozzle attachment potok unit
50.8h
482
use vacuum cleaner equipped with narrow nozzle attachment with
50.8h
483
toca gas analyzer calibration
50.8h
484
terminate charging of emu battery
51.0h
485
teardown of fluid servicing system fss
57.7h
486
swap makita battery and initiate charge
50.4h
487
start emu battery discharge
52.0h
488
slice fan checkout
51.7h
489
sdto component repair experiment 1
58.6h
490
scopemeter battery charge
50.7h
491
rss1 rss2 reboot
50.8h
492
robotics checkout
511.0h
493
reboot of all pcs once a week
52.0h
494
pulmonary function in flight puff final calibration
51.7h
495
potable water dispenser pwd flush
50.4h
496
post eva cleanup
55.3h
497
pma3 pressure check
51.2h
498
pma3 hatch seal inspection
52.3h
499
pma2 leak check start
51.7h
500
plasma crystal pressure check report to
50.4h

🎥 Filming & Imagery

2001–2014 · PDF crew timelines

Avg filming hours / day

0.99

across 4,327 days analysed

Total filming hours

4,289

camera · photo · video · livestream · earth observation

Estimated crew time cost

$558M

at $130,000/hr · NASA commercial crew rate

🎥 Filming Hours per Year

4,290total hours · 13 years

Camera · photo · video · livestream · earth observation

📊 Summary

Workload Over Time

Daily & 30-day rolling average4,327 days

Maintenance 30-day avg
Filming 30-day avg
Daily maintenance
Daily filming

📡 2015–2026 Era · Audio Transcripts

Classified from air-to-ground voice communications recorded by issinrealtime.org. Hours represent session wall-clock spans — not total crew time, only time spent communicating on each topic. Categories assigned by keyword majority-vote across utterances.

Classified activity hours

13,118 / 14,424h

across 3,732 days with transcripts

Top category

Internal Maint.

5,550 hours · 38% of classified time

📡 Activity Hours by Category · 2015–2026

14,424audio session spans · 12 years

Wall-clock span first-to-last utterance per session · issinrealtime.org